A short, practical list for anyone about to take handover in Dubai. Do these before you sign, not after.

Handover guide
The signature on the handover acceptance is the line between the developer problem and your problem. Before you cross it, do these seven things.
Ready to book. See handover inspection or pricing.
Thermal imaging included. Report within 24 hours. We only inspect, we never sell the repairs.
WhatsApp usCall +971 56 678 4803Book your WeSnag inspection before handover and let the developer fix the defects, not you.
Or reach us on +971 56 678 4803 and hello@wesnag.ae