Practical guides on snagging, handover, the defect liability period and property inspection in Dubai. Written by inspectors, for owners.

The defects we log again and again on Dubai handovers, from AC drainage to concealed moisture, and why catching them before you sign matters.

Taking handover on an off plan property in Dubai. The steps to follow, what to check, and when to bring in an independent inspection.

The developer walkthrough and an independent snagging inspection are not the same thing. Here is the difference, and why it matters for your money.

Why a thermal camera belongs on every property inspection, what it can and cannot see, and how it catches concealed moisture before it spreads.

A short, practical list for anyone about to take handover in Dubai. Do these before you sign, not after.

A pre purchase condition report on a resale property tells you exactly what you are buying before you commit. Here is why it is worth it.

DLP meaning, how long it lasts, and how to use it before it expires.

What a snag is, what counts, and why it matters in Dubai.

A room by room checklist for your handover walkthrough.

2026 price ranges and how to spot a false economy.
Book your WeSnag inspection before handover and let the developer fix the defects, not you.